AV人妻无码不卡手机在线,又色又爽又黄的视频日本人,亚洲国产欧美在线人成,日韩AV无码一区二区三

Home>>

How difficult could it be to transport wind turbine blades to the top of a cliff?

(People's Daily App) 15:54, February 21, 2023

This wind turbine blade is 75 meters long and weighs 19 tons. There are dozens of bends on this hillside road. It takes two weeks to transport a blade to the top of this cliff.

Workers need to overcome extreme cold and altitude sickness as well as heavy storms and snow.

(Produced by Gao Yuand and Dong Feng)

(Web editor: Zhang Kaiwei, Liang Jun)

Photos

Related Stories